
Part No. CJ520658 REV. C
2/2014
INSTALLATION
PAR Directional and
Directional Low V
ROUGH-IN SECTION
for
DP, DMRH and DLV
SAVE THESE INSTRUCTIONS
and familiarize yourself with
urn off electricity at the breaker
fuse box and follow National
WOOD OR STEEL JOIST CONSTRUCTION
On
24” centers (16” or 24” O.C. for 4”
g solid type (non-accessible)
G ROUTER FOR CEILING CUTOUT
Open lever (C) securing bar hangers -
s of hangers 90° (D) to be used as
, center in the vertical slot, and close le
(C) to lock; repeat on opposite side.
Secure a piece of plywood (E) to
n the bottom of the joists to support the fix
housing while attaching the bar hangers
) to the joists. This will position the
for drywall installer to provide
e (G) to locate fixture after ceiling has
T PAGE. Return and complete followin
s after feed wire connections have been
Using 1/8” router follow outside of
e to cut hole in ceiling.
Loosen (2) 5/16” screws (A) 180° apart, al
g fixture to drop down so bottom edge
r flange will be slightly above edge
receipt, thoroughly inspect
freight damage which should b
t to the attention of the
. Compare the catalog descriptio
d on the packing slip with the label o
e carton to ensure you have received
merchandise..
IMPORTANT SAFETY INFORMATION
For Your Protection, Read Carefully
WARNING - Risk of fire. Do not
insulation within 3 inches of fixture side
or wiring compartment, nor above
fixture in such a manner as to entra
-BAR CEILING INSTALLATION
Install ceiling panel in t-bar with
g precut. Ceiling opening must
y larger than the outside diameter of
Open lever (A), expand bar hangers
approximately 24” and close lever to lock
Through an adjacent opening, position
ing through the precut opening wit
notches on the bar hangers
Secure the bar hangers to the t-bar by
wiretie (by others) or bending end of
Open lever and adjust mounting fram
rtically so that the bottom edge of
flange is flush or slightly above th
edge of the ceiling panel.
.If fine tune adjustment from below ceiling is
: Loosen (2) 5/16” screws (A) 180°
, allowing fixture to drop down so
tom edge of plaster flange will be
above edge of ceiling material.
r to Figure 1.
1. Electric current can cause
handled properly. For your
always remember the following:
· Turn off the power supply.
· Ground the fixture to avoid
electrical shocks.
· Do not handle an energized fixture
energize any fixture with wet
when standing on a wet or dam
surface, or in water.
· Double check all electrical connections t
be sure they are tight and correct.
2. Specific safety informatio
concerning lamps:
· Match wattage of fixture and lamp
exactly.
· Do not remove or insert lamp when
power is on.
· Do notscratchglassor subjectlampto
undue pressure as either may cause
lamp breakage.
· Protect operating lamp from sources
of moisture.
· If lamp is marked it contains
mercury. Follow disposal laws. See:
www.lamprecycle.org.
Commentaires sur ces manuels